The Center for Deltaic Solutions

The Center for Deltaic Solutions

Completed Projects CENTER FOR COASTAL AND DELTAIC SOLUTIONS  FLC Systems joined forces with the Lemoine Company to build this amazing new building on the Mississippi River in Baton Rouge, Louisiana.   The Center for Coastal and Deltaic Solutions is the third building...
Louisiana Tech Pressbox Expansion

Louisiana Tech Pressbox Expansion

Joe Aillet Stadium Pressbox Expansion FLC Systems along with Lincoln Builders finished the pressbox expansion at Joe Aillet Stadium on the Louisiana Tech campus in the summer of 2018.    The new two-level facility includes luxury suites, press box and all of the...
Navy Federal Credit Union Phase 2

Navy Federal Credit Union Phase 2

FLC Systems is currently constructing Phase 2 of the Navy Federal Credit Union in Pensacola, Florida with Hensel Phelps. Phase 2 is a massive $594 million project that will construct two, six-story buildings with combined floor space of 1 million square feet, enough...
The Water Institute of the Gulf

The Water Institute of the Gulf

FLC Systems has recently been awarded the Water Institute on the Gulf with The Lemoine Company.  The Institute will be constructed in 3 phases.  The first phase of the project is the construction of a $16 million physical model of the lower Mississippi River, to be...
SE Louisiana Veterans Hospital

SE Louisiana Veterans Hospital

FLC Systems is currently working with Clark/McCarthy contractors on “Project Legacy” in New Orleans.  The new hospital is being constructed on a 30 acre site, and will be the home of 1,000 employees serving over 70,000 veterans in southeast Louisiana....